A selection of completed HDD projects across civil, water, telecommunications, electrical, and mining sectors.
4× HDD Ocean Outfalls
Confidential
Sydney's Northern Beaches, NSW
Four horizontal directional drilled ocean outfalls installed in Sydney's Northern Beaches.
Jervis Bay DFN Fibre Installation
Downer Group
Sanctuary Point, NSW
10 km of 110 mm HDPE installed over 40 days using three all-terrain drill rigs. Encountered 80% rock in environmentally sensitive areas.
- length
- 10 km
- conduit
- 110 mm HDPE
- duration
- 40 days
- conditions
- 80% rock, environmentally sensitive
Camden Valley Way Feeder
Ultegra
Camden Valley Way, NSW
200 m crossing with multiple bundled conduits (3× 180 mm and 2× 140 mm HDPE) in a single 550 mm bore, completed in 7 days.
- length
- 200 m
- conduit
- 3× 180 mm + 2× 140 mm HDPE in 550 mm bore
- duration
- 7 days
Glen Innes Water Main Upgrades
Glen Innes Severn Council
Glen Innes, NSW
Various water main upgrades with 200–350 mm HDPE conduits plus overflow drain installation. Granite rock drilling throughout.
- conduit
- 200–350 mm HDPE
- conditions
- Granite rock drilling on grade
Cessnock DFN Fibre Installation
Downer Group
Cessnock, NSW
12 km of 110 mm HDPE installed for a DFN fibre network using three all-terrain drill rigs.
- length
- 12 km
- conduit
- 110 mm HDPE
Mulgoa Road Upgrade
Seymour Whyte
Mulgoa Road, NSW
HDD works as part of major road upgrade for principal contractor Seymour Whyte.
Cameron Park Reservoir
Diona
Cameron Park, NSW
HDD pipeline works for reservoir infrastructure project.
Avoca Beach
EIRE Constructions
Avoca Beach, NSW
HDD works as part of civil infrastructure project at Avoca Beach.